Events with impact op het PRS - 10/12/2019

Works

UPDATE: The start of the measurements is postponed by 1 hour; they will be carried out between 2:00 pm and 3:00 pm.

Description and indicative timing

On 10/12/2019 from 1 pm to 2 pm:

  • Measurements Localizer 25L
  • Measurements glide path 25L with trailer mast

Closed runway

On 10/12/2019 from 1 pm to 2 pm:

  • Runway 07R/25L closed with a PPR of 15 min.

Planned runway use during the measurements

On 10/12/2019 from 1 pm to 2 pm:

  • Landing and take-off on runway 25R

Impact on the application of the PRS

On 10/12/2019 from 1 pm to 2 pm:

  • Landings that under normal conditions take place on runway 25L will move to runway 25R

Remarks

 

  • The monthly localizer measurements will be carried out at the same time as the ILS glidepath measurements
  • The exact period of execution can be modified on the day of the measurements in consultation between Navigation, Supervisor TWR and Airport Inspection.
  • These measurements will be postponed if the use of runway 07R/25L is imperative.

 

Related articles

Events with impact on the PRS - 11/01/2020

Works

On Saturday 11Janaury 2020, runway 25R will be closed to allow for preliminary measurements and core borings in view of the renovation of the runway.

Read more

Events with impact on the PRS - 15/12/2019

Works

On Sunday 15/12/2019 from 12pm to 4pm, runway 19 will be closed to allow for the calibration of the ILS signals.

Read more

Events with impact on the PRS - 11/12/2019

Works

Wednesday 11 December, runway 07R/25L will be closed from 12.10 pm to 12.40 pm for measurements by a land surveyor.

Read more
icon_info Plane departing Group 7 Created with Sketch. Icon triangle warning Icon triangle left Icon triangle right Icon close Icon triangle warning Questionmark Reason meteo Reason obstacles Reason unplanned Reason planned maintenance Reason capacity exceeded Reason unavailable (non-availability) Reason special activities Reason other Search Arrow right