Events with impact on the PRS - 08/10/2019

Works

Description and indicative timing

On 08/10/2019 from 12:15 pm to 01:15 pm:

  • Circle measurements localizer signal ( runway 25L)
  • Measurements of the glide path signal (runway 25L) using a measuring mast

Closed runways

On 08/10/2019 from 12:15 pm to 01:15 pm:

  • Runway 07R/25L closed, PPR 15 min.

Planned runway use during the works

On 08/10/2019 from 12:10 pm to 01:15 pm:

  • Take-off and landing on runway 25R

Impact on the application of the PRS

On 08/10/2019 from 12:15 pm to 01:15 pm:

  • The landings that under normal conditions take place on runway  25L will be moved to runway 25R

Remarks

 

 

 

 

  • The monthly circle measurement will be carried out at the same time as the ILS Glide path measurements using a trailer mast.
  • The exact timing can be modified on the day itself in concertation between Navigation, the Supervisor TWR and Airport Inspection.
  • These measurements will be postponed in case the use of runway  07R/25L is required.

Related articles

Events with impact on the PRS – 20/10/2019

Works

On 20/10/2019 from 11.30am to 5.00pm runway 25R /07L will be closed to allow for the calibration of the ILS signals.

Read more

Events with impact on the PRS – 19/10/2019

Works

On 19/10/2019 from 12.00pm to 6.00pm runway 07R/25L will be closed to allow for the calibration of the ILS signals.

Read more

Events with impact on the PRS - 16-17/10/2019

Works

From Wednesday 16 October 2019 at 11 pm to Thursday 17 October at 2 am, runways 25L/07R and 01/19 will be closed for a snow removal exercise.

Read more
icon_info Plane departing Group 7 Created with Sketch. Icon triangle warning Icon triangle left Icon triangle right Icon close Icon triangle warning Questionmark Reason meteo Reason obstacles Reason unplanned Reason planned maintenance Reason capacity exceeded Reason unavailable (non-availability) Reason special activities Reason other Search Arrow right